Manufacturing - Greenfield Project
Active network infrastructure
Installation of 720 cat 6A LAN points Between the racks
Installation of 680 cores of pre terminated fibre optic cables between network rack to all server racks
Removing and shifting of 120 servers and switches from Location A to Location B.
4x core switches,
6x firewalls,
30xservers and its related switches
Rack replication along with switches and routers
storage devices etc
Project in Numbers
30
Programs
50
Locations
200
Volunteers